Elburn & Countryside Headquarters Fire Station

LOCATION

Elburn, IL

COMPLETED

2017

CLIENTS INVOLVED

FGM Architects

PROJECT TEAM

David Merilatt, Joe Hainaut, and Robert Chrachol

INDUSTRY

Government

SOLUTIONS PROVIDED

Mechanical Engineering
Electrical Engineering
Plumbing Engineering

Project Description

WT Group’s MEP Engineering provided HVAC, Plumbing, Electrical and Sprinkler Engineering services for the 40,000 square foot, two-story Elburn and Countryside Fire Protection District’s new Headquarters Facility. Services Included:

  • Schematic Design
  • Design Development
  • Construction Document
  • Bidding and Negotiations
  • Construction Administration
  • Project Closeout

Design Features: The basement contains a public education room, training room, fitness room and a “museum” where the public can view artifacts and photos from the districts history. The first floor encompasses offices, break and conference rooms along with the apparatus bays and gear turnouts. The second floor holds 15 bunkrooms, kitchen, lockers and shower areas for the firefighters. A unique addition to this firehouse is the replacement of the traditional fire pole with a red slide. The slide starts at the living quarters and ends at the apparatus bay. Mechanical System Incorporates: An in-slab hot water radiant heated floor in apparatus bay, as well as an exterior snow melt. The first floor is conditioned by variable air volume (VAV) system with hot water reheat, which provides individual temperature control in each zone.

More Projects

AMLI Lofts

AMLI Lofts

View more
Gas N Wash

Gas N Wash

View more
Sargent Means Park – Bradford Barn

Sargent Means Park – Bradford Barn

View more