Woodridge Park District Athletic Recreation Center

LOCATION

Woodridge, IL

COMPLETED

2017

CLIENTS INVOLVED

Williams Architects & Woodridge Park District

INDUSTRY

Government

SOLUTIONS PROVIDED

Mechanical Engineering
Electrical Engineering
Plumbing Engineering
Fire Protection Engineering

Project Description

WT Group’s MEP Team provided HVAC, Plumbing, Electrical and Sprinkler Engineering services for the new ±75,000 square foot Athletic Recreation Center. Services Included:

  • Schematic Design
  • Design Development
  • Construction Document
  • Bidding and Negotiations
  • Construction Administration
  • Project Closeout
  • Design Features: Walking/Jogging Track
  • Cardio/Weight fitness area and aerobic room
  • Gymnasium
  • Ropes Course
  • Indoor artificial turf field
  • Multi-Purpose room, community resource center room, andchild watch room
  • Warming kitchen/concessions room
  • Locker rooms
  • Mechanical System Incorporates: Multiple VAV rooftop unitsand VAV boxes with hot water reheat serve each zone
  • High efficiency boilers provide hot water to VAV reheatcoils
  • A direct digital control system provides control andmonitoring the entire HVAC system
  • Plumbing System Incorporates: Sustainable design practicesinclude the use of low-flow fixtures, grease waste system, Interior stormsystem for roof drainage, sanitary and waste system and a domestic waterdistribution system.
  • Electrical System Incorporates: 1200-AMP, 277/480V, 3 phaseelectrical service with surge project
  • Exterior LED lighting and interior LED lighting withdaylight harvesting
  • Multi-level gymnasium and turf field lighting
  • Voice evacuation fire alarm system

More Projects

DuPage Medical Group

DuPage Medical Group

View more
AMLI Lofts

AMLI Lofts

View more
Addison Public Library Interior Renovation

Addison Public Library Interior Renovation

View more