WT Group’s MEP Team provided HVAC, Plumbing, Electrical and Sprinkler Engineering services for the new ±75,000 square foot Athletic Recreation Center. Services Included:
- Schematic Design
- Design Development
- Construction Document
- Bidding and Negotiations
- Construction Administration
- Project Closeout
- Design Features: Walking/Jogging Track
- Cardio/Weight fitness area and aerobic room
- Gymnasium
- Ropes Course
- Indoor artificial turf field
- Multi-Purpose room, community resource center room, andchild watch room
- Warming kitchen/concessions room
- Locker rooms
- Mechanical System Incorporates: Multiple VAV rooftop unitsand VAV boxes with hot water reheat serve each zone
- High efficiency boilers provide hot water to VAV reheatcoils
- A direct digital control system provides control andmonitoring the entire HVAC system
- Plumbing System Incorporates: Sustainable design practicesinclude the use of low-flow fixtures, grease waste system, Interior stormsystem for roof drainage, sanitary and waste system and a domestic waterdistribution system.
- Electrical System Incorporates: 1200-AMP, 277/480V, 3 phaseelectrical service with surge project
- Exterior LED lighting and interior LED lighting withdaylight harvesting
- Multi-level gymnasium and turf field lighting
- Voice evacuation fire alarm system